Snellville |
Code of Ordinances |
Appendix A. DEVELOPMENT REGULATIONS |
Article 8. SITE GRADING, STORM WATER DETENTION, CULVERTS AND PIPED DRAINAGE SYSTEMS AND SOIL SEDIMENT CONTROL REQUIREMENTS |
Article 8. SITE GRADING, STORM WATER DETENTION, CULVERTS AND PIPED DRAINAGE SYSTEMS AND SOIL SEDIMENT CONTROL REQUIREMENTS
§ 8.1. SITE GRADING |
§ 8.1.1. [Standards.] |
§ 8.1.2. [Grading plans.] |
§ 8.1.3. [Property within jurisdiction of Metropolitan River Protection Act.] |
§ 8.1.4. [Embankments.] |
§ 8.1.5. [Slopes for cut or fill.] |
§ 8.1.6. [Stabilizing slopes.] |
§ 8.1.7. [Lot to lot drainage.] |
§ 8.1.8. [Grading for roads and improved ditches.] |
§ 8.1.9. [Drawings, plans, calculations and other data.] |
§ 8.2. STORMWATER MANAGEMENT |
§ 8.2.1. Storm water management report required. |
§ 8.2.2. Storm water detention required. |
§ 8.2.3. Detention design criteria—General. |
§ 8.2.4. Detention facility location criteria. |
§ 8.2.5. Detention facility easement requirements. |
§ 8.2.6. Detention facility maintenance. |
§ 8.2.7. Detention facility construction standards. |
§ 8.2.8. Detention facility engineer's certification and record drawings. |
§ 8.3. CULVERTS AND PIPED DRAINAGE SYSTEMS |
§ 8.3.1. Drainage improvements required. |
§ 8.3.2. Standard specifications. |
§ 8.3.3. Design criteria—General. |
§ 8.3.4. Design criteria—Culverts. |
§ 8.3.5. Piped collection systems. |
§ 8.3.6. Energy dissipation—Piped systems and culverts. |
§ 8.3.7. Minimum pipe and pipe coating requirements. |
§ 8.3.8. Pipe length. |
§ 8.3.9. Pipe installation. |
§ 8.3.10. End finish. |
§ 8.3.11. Junction boxes and catch basins. |
§ 8.3.12. Other structures. |
§ 8.4. SURFACE DRAINAGE. |
§ 8.4.1. Design standards. |
§ 8.4.2. Construction standards. |
§ 8.5. EROSION CONTROL. |
§ 8.5.1. Design standards. |
§ 8.5.2. Abandoned projects. |
§ 8.6. DAMS. |
§ 8.6.1. New dams which become subject to the requirements of the Georgia Safe Dams Act and Rules for Dam Safety. |
§ 8.6.2. New dams subject to regulation by the City of Snellville. |
§ 8.6.3. Existing dams. |
§ 8.6.4. Existing category II dams. |
§ 8.7. EXTENDED DETENTION. |
§ 8.7.1. Wet extended detention facility design requirements. |
§ 8.7.2. Dry extended detention facilities. |
§ 8.7.3. Reserved. |
§ 8.7.4. Stream buffers and impervious surface setbacks. |
§ 8.7.5. Wet and extended detention facility maintenance. |
§ 8.8. RESERVED. |
§ 8.9. WATER QUALITY BEST MANAGEMENT PRACTICES |
§ 8.9.1. Treatment of runoff. |
§ 8.9.2. Facility location criteria. |
§ 8.9.3. Easement requirements. |
§ 8.9.4. Facility maintenance. |
§ 8.9.5. Facility certification and record drawings. |
§ 8.9.6. Existing subdivisions with regional water quality facilities. |
§ 8.9.7. Existing subdivisions without regional water quality facilities. |
§ 8.9.8. Retrofitting of existing detention facilities for water quality treatment. |
§ 8.9.9. Retrofitting of existing water quality facilities. |
§ 8.9.10. Redevelopment. |